Quality Control Criteria Banks – ITeC

On this page you can download the ITeC quality control criteria banks that are used in the quality module of the TCQ program.

Year 2025

The quality control criteria banks that you can download belong to the type of building and civil engineering work.

This documentation encompasses almost all the tests that can be used in the different types of works (new construction, rehabilitation, urbanization; and roads and transport) and are associated by default with those contemplated as mandatory in the current regulations.

Like any other database, it must be understood as a general reference, which requires its own particularization in each case. Therefore, it is the people responsible for the establishment of the quality control plan or program who must adapt the information from the aforementioned bank to the specificity of the work, while modifying the control criteria (adding or removing trials, varying the control frequencies, etc.).

The bank of quality criteria includes:

  1. Criteria for testing frequencies
  2. Association of construction items – control areas (with the BEDEC 2025 bank)
  3. Specifications (extracted from the technical specifications or corresponding regulations)
  4. The prices of the essays include 13% in terms of general expenses, and 6% in terms of industrial profit; therefore, you need to pay special attention when setting up the last sheet of the quality control budget, as only 21% VAT will need to be applied .

If the installation is over the network, download the file and run the file first on the server and then on each user.

If this is a single-user installation, download the file and run it on your own computer.

The last bank installed will appear as the default bank in the “Create Quality / Criteria Bank” window and in the “General / Select Criteria Bank” window of the TCQ Quality Control Management module.

If you wish, you can select another bank in both options.

With the option “Utilities / Transfer from criteria bank” you can transfer information from criteria banks to the quality of your work.

 

previous years